日本高清一区二区三区水蜜桃 ,97超在线视频免费,精品免费在线,国产2021精品视频免费播放,久久免费视频国产,欧美自拍视频在线,初高中生精品福利视频,日韩毛片在线,精品2021露脸国产偷人在视频,少妇AV射精精品蜜桃专区

              熱線電話
              百葉窗圖片載入中
              ?
              聯(lián)系我們

              Guangdong Lituo automation equipment Co., Ltd

              Contact: Mr. Zhang

              Sales Hotline: 18665717216

              Telephone: 020-84551179

              Fax: 020-31076026

              QQ:731306804

              Mailbox: zhangging@litou668.com

              URL: m.aimashi.cc

              Address: Almond altar town, shunde district, foshan city, GaoZan Village Gao Gui Lucy 2 no. 1 # 3

              How to adjust the operation of the coating machine?

              How to adjust the operation of the coating machine?

              In this age of mechanization, any work is done using machines, but for the wrapping machine, if there is a quality problem in use. Well, do you know how to debug? Your first response is to shut down the machine and debug it. But the mechanical involved too many products. If stopped, the entire production could be scrapped. And in the face of such a thing, do you know how to debug the coating machine?

              Debugging of woodworking cladding machine:

              1, the location for the profile: take a good production profile, requirements: not bent or distorted, on the bed on a conveying wheel, according to the profile width, shape and coating requirements, adjustment between the two rows of the conveying wheel distance; adjustment by foot and platform width and height, which is suitable for coating profile requirements installed on both sides of the guide wheel; the conveying wheel is parallel to the direction of movement and profile.

              2 、 press wheel installation and adjustment: according to the profile of the profile to install and adjust the small pressure roller, generally choose profiles central line or section, the outline of the main curve of points or low, along the contour line by point transition, rolling. Compound the profile with the diaphragm. Installation of small pressure wheel to make the line force balance, about the same time. There is a press wheel, the bottom must be installed support wheel, make the line up, down, left and right force balance. Otherwise, the line will appear at the junction of false and so on. The large plane can be crushed by the small pressure wheel from the center to the two sides, and the small pressure wheel 3 will gradually rotate at the 90 degree corner. The shape of the complex lines, small pressure wheel should be arranged naturally, can not be forced to shape. In particular, decorative paper should be more natural and smooth.

              Application of coating machine 3, rubber box or roll coating system

              The cold box operation method:

              Unloading of rubber box: the rubber box is lifted up smoothly and the rubber box is naturally separated from the platform.

              Adjust the thickness of the adhesive layer: adjust the thickness of the adhesive layer by turning the lifting bolts at the lower sides of the rubber box.

              The roller coating device use:

              Can adjust the coating layer thickness on the rotating shaft frictioning plastic box. Turn the adjusting handle, turn clockwise, thicken the rubber band, turn counterclockwise, and make the adhesive layer thin. Until the coating is even.

              尤物成av人片在线观看| 婷婷丁香五月中文字幕| 欧美成人中文字幕| 成人影院免费视频观看| 亚洲精选自偷拍一区二| 亚洲av无码一区二区三区人| 国产天堂网站麻豆| 国产一区二区三区视频免费在线| 人妻夜夜爽天天爽三区麻豆av| 中文字幕日韩精品一区二区三区| 国产偷窥熟女精品视频| 台湾佬中文偷拍亚洲综合| 很黄很色的女同视频一区二区 | 国产高清大片一级黄色| 免费av片在线观看网址| 精品人妻少妇一区二区三区不卡| 亚洲国产精品悠悠久久琪琪| 免费av在线 国产精品| 老师开裆丝袜喷水视频| 日产精品久久久久久久性色| 成人午夜免费福利| 大陆成人精品自拍视频在线观看| 成人免费无遮挡在线播放| 人人狠狠综合久久亚洲婷婷| 国产成人午夜av影院| 亚洲女优中文字幕在线观看| 成人三级a视频在线观看| 8av国产精品爽爽ⅴa在线观看| 亚洲一区二区三区18| 青青草原亚洲| 精品国产高清a毛片无毒不卡| 中文字幕在线人妻视频| 久久精品熟女亚洲av麻| 四虎影视在线影院在线观看| 日韩成人精品日本亚洲| 亚洲av乱码一区二区三区人人| 国产精品理论片| 手机看片福利盒子久久青| 日韩字幕无线乱码免费| 久久精品国产亚洲av麻豆色欲| 国产精品香蕉在线观看|